• Clock icon white

    24 HOURS

    turn around to engineer a solution
  • Cancel icon white

    NO

    survey required
  • Stop icon white

    4 WEEKS

    production loss prevented
  • People icon white

    IMPROVED

    safety.

An Operator needed a stress critical pipe support to be designed and fabricated as a result of a failed nozzle that was fundamental to the integrity of one of its production critical vessels. This had resulted in a shutdown and subsequent loss of production.

By using the Eserv’s AS-TEG™ Platform, the operator’s engineering service provider was able to use the data to conduct a stress analysis and engineer a solution without an onsite survey. By controlling the legacy data, we enabled the operation to react within 24 hours, not weeks.

Whether it’s across commercial, design, integrity, maintenance and/or safety arenas, let AS-TEG™ take your data to the max for a single function or for multiple ones.